Bluff Park United Methodist Church

Owner: Bluff Park United Methodist Church
Client: Stewart Design Studios
Location: Hoover, Alabama

Scope of Service: Responsible for the design and construction phase services of a new sanctuary and educational building and link it two an exiting facility.

 

 

 

 

Back to Buildings - New Facilities


Alabama Power Company - Auburn Business Office

Owner & Client: Alabama Power
Location: Auburn, Alabama

Scope of Service: Provide structural engineering services associated with a 4,800 square foot single story office building.

Back to Buildings - New Facilities


WEWN Catholic Shortwave Radio Service Building

Owner and Client: Eternal Word Television Network
Location: Vandiver, Alabama



Scope of Service/Project Description: Responsible for the design of transmitter building, vehicle storage and maintenance building, and associated equipment foundations for the largest privately owned shortwave facility in the United States. Also functioned as overall project coordinator responsible for facilitating coordination and communication between the owner, other consultants, equipment suppliers, the general contractor and major subcontractors.

Back to Buildings - New Facilities


Pell City Post Office

Owner: United States Postal Service
Client: Joyce Prout and Associates
Location: Pell City, Alabama

Scope of Service: Responsible for the design and construction phase services for a 15,000 square foot postal facility.

Back to Buildings - New Facilities


Alabama Power Company - Birmingham District Office

Owner & Client: Alabama Power
Location: Birmingham, Alabama

Scope of Service/Project Description: Responsible for the structural design of a 40,000 square foot office building. The two story composite steel framed structure houses sales, engineering and maintenance facilities. Foundation design on this project was complicated by the presence of underground fiber optic cables which provide telephone service to a large portion of the Birmingham area. Because these utilities were located directly beneath the building site, careful planning and design was necessary in order the ensure that neither the construction activities or the building foundations would adversely impact these utilities.

Back to Buildings - New Facilities


Tube City Recyling Facility

Owner: USX Steel Works
Client: Tube City Recyling Facility
Location:
Gary, Indiana

Scope of Service/Project Description: Responsible for the design of a scrap metal processing facility. This installation consists of a heavy mat foundation supporting a vertical shear press, a steel framed protective enclosure and a 40 foot steel observation/operations tower. At the time of the projects completion, this installation was the largest of its type in the United States.

Back to Buildings - New Facilities


A Barn and Riding Arena

Owner and Client: Mr. and Mrs. Richard I. Pigford
Location: Leeds, Alabama

Scope of Service/Project Description: Responsible for the design of a large reinforced concrete barn and arena. Concrete was cast with coarse aggregate, low slump, and minimal vibration to achieve an aged appearance.

Back to Buildings - New Facilites


McCormick Residence

Owner: Mr. and Mrs. McCormick
Client: Birchfield and Penuel and Associates
Location: Shoal Creek, Alabama

Scope of Service: Design of an approximately 7,000 square foot residence with wood and steel framing system.