Inland Dam Renovation
Owner & Client: Birmingham Water Works Board
Location: Blount County, Alabama
Scope of Service: Prime Design Professional.
Design of a new intake structure and spillway modifications.
Serve as the
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
1. before construction
2. during construction
3. above spillway wall
4. wall construction
5. existing intake
6. blasting existing structure
7. structure demolished
8. tunnel excavation
9. intake structure construction 1
10. intake structure construction 2
11. last look up intake structure
12. new intake structure
