Inland Dam Renovation
Owner & Client:
Birmingham Water Works Board
Location: Blount County, Alabama
Scope of Service: Prime Design Professional. Design of a new intake structure and spillway modifications. Serve as the

Spillway Renovation:

1. 2. 3. 4.

Intake Structure Demolition and Tunnel Construction:

5. 6. 7. 8.

New Intake Structure:

9. 10. 11. 12.

1. before construction
2. during construction
3. above spillway wall
4. wall construction
5. existing intake
6. blasting existing structure
7. structure demolished
8. tunnel excavation
9. intake structure construction 1
10. intake structure construction 2
11. last look up intake structure
12. new intake structure