BridgesOwner: Honda Manufacturing of Alabama
Client: Morris Group Inc.
Location: Lincoln, Alabama
Project: The project consists of the design and construction of a two lane, 36 feet wide bridge over an existing plant road. The bridge consists of a 110 feet center span over the existing road and end spans of approximately 40 feet each.
Scope of Service: Design of the bridge deck, the support piers and abutments, foundations and piling, barrier rails, slope paving, and 40 feet of approach slabs at each end of the bridge. The design of the pre-stressed girders performed by Sherman Industries.