2320 Highland Avenue South, Suite 100
Birmingham, Alabama 35205-2900
Telephone 205-933-1080
Fax 205-933-1088

 

 

 

Bridge over CSX Railroad Ross Bridge Development

Hoover, Alabama

The bridge over CSX railroad is located at The Ross Bridge  development in the City of Hoover. The development was designed and constructed by The Daniel Corporation and USX Reality. The design of the bridge includes the horizontal, vertical and superelevation features required by the roadway alignment and as well as features to support gas, water, electrical and other utilities servicing the development. The bridge also includes a pedestrian walkway that connects paths traversing the development. The bridge has  a 102 foot span with  BT54 prestressed girders and a 47 feet span with AASHTO type II concrete girders.

 

 

© 2011 Christy/Cobb, Inc. - All Rights Reserved